Idilia Foods industrial plant complex

© José Hevia
  • Client:

    Arquid and IPS Spain

  • Project by:

    Arquid and IPS Spain

  • Developer:

    Idilia Foods

  • Location:

    Parets del Vallès, Barcelona, Spain

  • Area:

    16,000 m2

  • Project budget:

    €13,000,000

  • Project execution date:

    2018

  • Building Date:

    2019

  • Scope of Works:

    Structural Ejecution Project and Building Site Assistance

  • Project Status:

    Constructed

  • Awards:

    Architecture | Industrial Buildings in the LOOP Design Awards 2024

“The project is integrated with the existing complex through the use of the same precast concrete façade elements, incorporating a color scheme inspired by the brand’s image.”

© José Hevia

The project consists of the construction of two buildings within an industrial area — one intended for storage and the other for production.
The storage building is attached to an existing structure along one of its façades. It comprises a ground floor with a reinforced concrete slab foundation and a roof made of prestressed and precast concrete beams, precast concrete purlins, and a light Deck-type finish. The vertical structure is composed of precast concrete columns.

 

© Imagen Subliminal

The project consists of the construction of two buildings within an industrial area — one intended for storage and the other for production.
The storage building is attached to an existing structure along one of its façades. It comprises a ground floor with a reinforced concrete slab foundation and a roof made of prestressed and precast concrete beams, precast concrete purlins, and a light Deck-type finish. The vertical structure is composed of precast concrete columns.