Idilia Foods industrial plant complex
-
Client:
Arquid and IPS Spain
-
Project by:
Arquid and IPS Spain
-
Developer:
Idilia Foods
-
Location:
Parets del Vallès, Barcelona, Spain
-
Area:
16,000 m2
-
Project budget:
€13,000,000
-
Project execution date:
2018
-
Building Date:
2019
-
Scope of Works:
Structural Ejecution Project and Building Site Assistance
-
Project Status:
Constructed
-
Awards:
Architecture | Industrial Buildings in the LOOP Design Awards 2024
“The project is integrated with the existing complex through the use of the same precast concrete façade elements, incorporating a color scheme inspired by the brand’s image.”
© José Hevia
The project consists of the construction of two buildings within an industrial area — one intended for storage and the other for production.
The storage building is attached to an existing structure along one of its façades. It comprises a ground floor with a reinforced concrete slab foundation and a roof made of prestressed and precast concrete beams, precast concrete purlins, and a light Deck-type finish. The vertical structure is composed of precast concrete columns.
© Imagen Subliminal
The project consists of the construction of two buildings within an industrial area — one intended for storage and the other for production.
The storage building is attached to an existing structure along one of its façades. It comprises a ground floor with a reinforced concrete slab foundation and a roof made of prestressed and precast concrete beams, precast concrete purlins, and a light Deck-type finish. The vertical structure is composed of precast concrete columns.